National Pooling Administration
Tools - Archives, Tip of the Month - 2004, November
Standard Effective Date for
Thousands-Blocks
As a reminder, per section 8.2.4 of the Thousands-Block Number
(NXX-X) Pooling
Administration Guidelines:
8.2.4
- Applicants requiring an Effective Date
more than 33 calendar days after the date
the PA receives the application should
specify their desired Effective Date. An
application without an Effective Date will
be assigned the standard PA-assigned minimum
Effective Date of 24 calendar days after the
Allocation Date; this allows the standard 5
days for AOCN entry of data into BIRRDS plus
the standard 19-day notification interval.
The PA shall always assure a minimum of 24
calendar days between the Allocation Date
and the Effective Date, unless requested
otherwise through the expedite process (see
Section 8.6).
- SPs must allow at least two calendar
days beyond the Effective Date prior to
activating TNs within the assigned
thousands-block. For example, if the
Effective Date is October 28, XXXX, an SP
can start assigning TNs on October 30, XXXX.
This is necessary in order to allow for NPAC
processing and downloading to occur.
- The 21 calendar day notification
interval (i.e., from AOCN input of thousands-block data
into BIRRDS through completion of NPAC processing) is
necessary because of some SP's internal company
notification processes (19 days) and the 2-day NPAC
update. It should be noted that interconnection
arrangements and facilities need to be in place prior to
activation of a thousands-block. Such arrangements are
outside the scope of these guidelines.
|